Deferral Inquiry of Road Construction
M. Kumaravel
Pages: 1-43 | First Published: 05 Nov 2022
Full text | Abstract | Purchase | References | Request permissions

Abstract
Delay in construction industry is a global phenomenon, especially in highway projects and there is no exception. It is widely accepted that a project is successful when it is finished on time and cost. Regrettably, large number of construction projects fails to follow the planned schedule due to many reasons and hence delayed. In any construction project, scheduling and delay analysis becomes an imperative in order to minimize delays. The application of construction schedule to predict the project completion time. Delay in completion of project can increase the price of the project. Project Management is the main key role in the construction industry. Small projects will be managed with efficiency manually; whereas massive projects aren't therefore massive projects will be better handled by the utilization of computers. Many varieties of software package are offered with the assistance of that project management will be done simply. In highway construction, entirely different resources are needed for execution and also the risk is additional during this form of projects. So, proper planning and scheduling are needed in massive projects to ensure that a construction project is completed on time and within budget. In our project an attempt is created in scheduling and delay analysis of varied activities concerned in highway construction in Thanjavur district, Tamilnadu by using primavera software. The length of the highway is 47.835 Kms. Four lane configuration of flexible pavement including construction of culverts, minor bridges, major bridges, Flyover, VUPs, PUPs etc., and its scheduled to 730 days.. Keyword: Delay analysis, Highway Construction, Primavera, Time and Cost

1. Abdulaziz A. Bubshait and Michael J. Cunningham (August 1998), "Comparison of delay analysis methodologies", Journal of Construction Engineering and Management, pp 315-322. 2. Abdalla M. Odeh and Hussaien T. Battaineh (2002), “Causes of Construction delay: traditional contracts”, International Journal of Project Management, PERGAMON, 20, pp 67-73. 3. Sadi A. Assaf and Sadiq Al-Hejji (2006), „„Causes of delay in large construction projects”, International Journal of Project Management, ELSEVIER, 24, pp 349-357. 4. Aswathi R and Ciby Thomas (December 2013), “Development of a Delay Analysis System for a Railway Construction Project”, International Journal of Innovative Research in Science, Engineering and Technology, ICEE, Vol. 2, Special Issue 1, pp 531-541. 5. MuraliSambasivan and Yau Wen Soon (2007), “Causes and Effects of Delays in Malaysian construction industry”, International Journal of Project Management, 25, pp 517-526.
6. M.E. Abd El-Razek, H.A. Bassioni and A.M. Mobarak (Nov. 2008), “Causes of delay in Building construction Projects in Egypt, Journal of Construction Engineering and Management, ASCE , pp 831- 841.
7. B. Indhu and P. Ajai (May 2014), “Study of Delay Management in a Construction Project – A Case Study”, International Journal of Emerging Technology and Advanced Engineering, Vol. 4, Issue 5, pp 108 – 113.
8. Keval J. Shah and Prof. M. R. Apte (2015), “Causes of Delay in Construction of Bridge Girders”, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), Volume 12, Issue 1 Ver. IV, pp 08-12. 

9. SreeLekshmi A and Vishnu Unnikrishnan (June 2018). “Planning and Delay Analysis of a Residential Complex: A Case Study”, International Journal of Civil Engineering and Technology, Vol. 9, Issue 6, pp 1191-1201.
I. Michael Raj and M. Panimalar (May 2019), “Schedule delay analysis in construction management”, International Research Journal of Engineering and Technology (IRJET), Vol. 6, Issue 5, pp4835-4843 

10. Vidhya, K., & Kandasamy, S. (2014). Study on the flexural strength of coal ash brick masonry wall elements. Journal of Structural Engineering (India), 41(4), 410–419. 

11. Sudharsan, N., & Grant, B. C. J. (2018). Comparison of static response of laced reinforced concrete beams with conventional reinforced concrete beams by numerical investigations. International Journal of Civil Engineering and Technology, 9(8), 700–704 

12. Vidhya, K., & Kandasamy, S. (2016). Experimental Investigations on the Properties of Coal-Ash Brick Units as Green Building Materials. International Journal of Coal Preparation and Utilization, 36(6), 318–325.